Inspection sheet.
Mechanical closet overhead pipe support.
Ductwork strap to angle iron to framing.
Hallway suspended ceiling wired to framing.
Elec. Conduit draped to framing.
Nursery /. Ceiling tile missing and several are lose!
Lose tiles on ceilings in all classrooms.
Classroom ceiling.
Speaker in classroom / loose tiles surrounding .
Speaker screwed to wood framing above.
Lighting in classrooms sucured with srcews.
Wood speaker box to wood framing above suspended ceiling.
Speaker suspended ceiling.
Foyer- screws missing from grill.
Projection screen in wood framing.
Chapel ceiling /. Drywall on wood framing.
Wood framed light cove.
Ductwork straps screwed to framing.
Suspended ductwork in attic ,strapped to framing.
Basketball standard.
Basketball standard bolted to concrete block wall.
Cultural hall ceiling.
Loose ceiling tiles in cultural hall.
Wood speaker boxes to framing above.
Electric scoreboard bolted to wall.
Skylight in serving area.
Stage curtains secured to ceiling with screws.
Stage lights hung on eye hooks.
Projection screen in classroom.
Projection screen screwed and anchor.
Loose trim at front of Chapel.
Wood framed sound room in Chapel.
Framing secured by strong ties .
Ceiling repair in Chapel .
Tape seam on repair is coming loose.
No comments:
Post a Comment