Moultrie,Ga. Building.
Inspection sheet.
Suspended ceiling with 2x2 drop in tile though out building.
Ceiling tie wires screwed to wood framing
Pipe hangers lagged to wood framing.
Hvac straps screwed to wood blocking screwed to framing.
Metal speaker boxes supported on ceiling grid,/ no support wire.
Spotlights in Foyers are setting directly on tile,making tile sag.
Manufactures mounting braces not used
Tile sagging because light not properly installed.
Chapel ceiling light and speaker array.
Won door in chaple.
Speaker array.wood framing attached to main structure.
Trac lights screwed to wood framing.
Retractable basketball standard.
Suspended ductwork in attic.
Framing in ceiling above cultural center for light and speaker arrays.
Mounting bolts for basketball standard.
Framing for basketball standard mounts.
Wood framed ceiling over bathrooms and custodial closet, boxes on pipes and wires ,not good!
Chandeliers in relief society room.
Chandelier mounted to metal box attached to wood framing.
Drop ceiling in class room.
Water damage from hvac above.
Light and speaker array in cultural center. Wood framing.
Font mirror mounting bracket. Lower. Screwed to wood framing.
Font mirror. Chain and eye hook fastened to wood framing.
Font mirror.
Chaple.
No comments:
Post a Comment