Inspection sheet
Hallways/ drop ceiling/ 2 by4 lighting.
Suspended ceiling tied into framing.
Multiple purpose room/ chandelier lighting.
Mounting for chandelier. Metal box to wood framing.
Wan door in classroom.mounted to lam beam.
Classroom ceiling. Tile on drywall to wood framing.
Nursery ceiling. Water damage.
Foyer area. 2 by 4 lighting.
Mechanical room/ suspended lighting.
Fastened to wood framing.
Sprinkler pipe. Steel rod to wood framing.
Speaker outside of bishop office.
Speaker box mounted in tile. Not supported by grid.
Speaker sagging on tile. Not mounted correctly.
Suspended hvac. Fastened to wood framing.
Chapel area ceiling.
Wood framed sound box.
Chandelier mounting. Metal box to wood framing.
Cultural hall. Broken tiles in ceiling.
Plywood wall. No access to basketball standards.
Wan door dividing chapel and cultural hall.
Bolts for wan door. Mounting.
Speaker box/wood framed. Supported by grid.
No comments:
Post a Comment